For Facility engineering

See the building's weak points before a fault finds them.

The power path, ride-through, cooling heat balance, environment, single points of failure, a what-if for every asset and the maintenance plan.

Your questions

The plant, read as minutes, kilowatts and spares.

Facilities: the power path from the utility feed to the rack, the ride-through card, cooling per floor and the what-if.

Questions answered

How does DCHelix calculate UPS ride-through?

From the UPS minutes at today's load, then the generator kilowatts, start readiness and fuel hours at the current draw. Each figure shows the checks behind it, so the team sees how long the building holds if the utility fails now, and which part of that chain is the weak link.

What does the what-if show before maintenance?

Take away a feed, a UPS, one power side, a PDU, a cooling unit or a fibre trunk, and the what-if lists every rack, device, service and customer that would lose supply or redundancy, starting from the faults already open today. The maintenance is then booked as a change with that impact attached.