Operate · Facilities
Know how long the building holds if the utility fails.
A single-line power path from the utility to the rack, a 24-hour load chart against capacity, and a ride-through card: UPS minutes, generator kW, fuel hours and readiness checks. Cooling heat balance, environment zones, single points of failure with a what-if, and the maintenance plan.
Who opens it
When the utility feed is in question.
Facilities answers in minutes, kilowatts and litres: how long the building holds, what cooling is spare and what a planned outage would take with it.
The ride-through card: UPS minutes, then generator kW and fuel hours, with the readiness checks behind them.
Cooling per floor against its heat load, with the spare unit named or marked missing.
The what-if: take the UPS away and see every rack, device and service that goes dark.
On the screen
What the screen holds.
The power path from the utility to the rack, the ride-through card and cooling per floor, read from the live plant.
Also on the screen
Single points of failure
Devices with both cords on A, failed PSUs, tripped PDUs, cabinets one side cannot carry, single feed or tray route, lost cooling spare.
Maintenance and safety
A PM plan for every plant asset, booked as a change, plus fire zones, leak detection and resilience tests.
Related
Works together with
Facilities shares one estate model with the modules it hands off to.
See your own estate in it.
Bring the fault your team keeps dealing with. We walk it end to end on a demo estate shaped like yours, then agree what a one-site pilot should prove.