Operate · Facilities

Know how long the building holds if the utility fails.

A single-line power path from the utility to the rack, a 24-hour load chart against capacity, and a ride-through card: UPS minutes, generator kW, fuel hours and readiness checks. Cooling heat balance, environment zones, single points of failure with a what-if, and the maintenance plan.

Who opens it

When the utility feed is in question.

Facilities answers in minutes, kilowatts and litres: how long the building holds, what cooling is spare and what a planned outage would take with it.

Facility engineer asksIf utility power fails now, how long do we have?

The ride-through card: UPS minutes, then generator kW and fuel hours, with the readiness checks behind them.

Mechanical engineer asksIs there a spare cooling unit on this floor?

Cooling per floor against its heat load, with the spare unit named or marked missing.

Electrical engineer asksWhat breaks if we take UPS-2 down?

The what-if: take the UPS away and see every rack, device and service that goes dark.

On the screen

What the screen holds.

The power path from the utility to the rack, the ride-through card and cooling per floor, read from the live plant.

Also on the screen

Single points of failure

Devices with both cords on A, failed PSUs, tripped PDUs, cabinets one side cannot carry, single feed or tray route, lost cooling spare.

Maintenance and safety

A PM plan for every plant asset, booked as a change, plus fire zones, leak detection and resilience tests.

See your own estate in it.

Bring the fault your team keeps dealing with. We walk it end to end on a demo estate shaped like yours, then agree what a one-site pilot should prove.